Description:
An upgrade campaign is launched on all Nexus 5000/5600/6000 of Baremetal aggregator switches.
Impact:
None, upgrade is done trough ISSU (In Services Software Upgrade)
Duration:
Each couples of Nexus 5000/5600/6000 take 1h30-3h00 to be fully upgraded.
6th April 2021 starting at 07h00 (Paris time) on Beauharnois, CA Datacenter:
bhs5-16a-n56
bhs5-16b-n56
bhs6-12a-n56
bhs6-12b-n56
bhs7-10a-n56
bhs7-10b-n56
****************************************************************************************
6th April 2021 starting at 22h00 (Paris time) on Roubaix, FR datacenter:
sw.178.33.126.248-n5
sw.178.33.126.249-n5
sw.178.33.228.248-n5
sw.178.33.228.249-n5
sw.178.33.232.248-n5
sw.178.33.232.249-n5
sw.178.33.234.248-n5
sw.178.33.234.249-n5
**************************************************************************
7th April 2021 starting at 07h00 (Paris time) on Singapour, CA Datacenter:
sgp1-10a-n56
sgp1-10b-n56
**************************************************************************
7th April 2021 starting at 22h00 (Paris time) on Roubaix, FR datacenter:
sw.178.33.236.248-n5
sw.178.33.236.249-n5
sw.178.33.238.248-n5
sw.178.33.238.249-n5
sw.178.33.60.248-n5
sw.178.33.60.249-n5
sw.178.33.61.248-n5
sw.178.33.61.249-n5
******************************************************************************
8th April 2021 starting at 07h00 (Paris time) on Sydney, CA Datacenter:
syd1-10a-n56
syd1-10b-n56
************************************************************************
8th April 2021 starting at 22h00 (Paris time) on Roubaix, FR datacenter:
sw.178.33.62.248-n5
sw.178.33.62.249-n5
sw.178.33.63.248-n5
sw.178.33.63.249-n5
sw.178.165.12.248-n5
sw.178.165.12.249-n5
sw.178.165.13.248-n5
sw.178.165.13.249-n5
Date: Sunday, 11 April 2021, 03:08AMDetails
Description:
An upgrade campaign is launched on all Nexus 5000/5600/6000 of Baremetal aggregator switches.
Impact:
None, upgrade is done trough ISSU (In Services Software Upgrade)
Duration:
Each couples of Nexus 5000/5600/6000 take 1h30-3h00 to be fully upgraded.
6th April 2021 starting at 07h00 (Paris time) on Beauharnois, CA Datacenter:
bhs5-16a-n56
bhs5-16b-n56
bhs6-12a-n56
bhs6-12b-n56
bhs7-10a-n56
bhs7-10b-n56
****************************************************************************************
6th April 2021 starting at 22h00 (Paris time) on Roubaix, FR datacenter:
sw.178.33.126.248-n5
sw.178.33.126.249-n5
sw.178.33.228.248-n5
sw.178.33.228.249-n5
sw.178.33.232.248-n5
sw.178.33.232.249-n5
sw.178.33.234.248-n5
sw.178.33.234.249-n5
**************************************************************************
7th April 2021 starting at 07h00 (Paris time) on Singapour, CA Datacenter:
sgp1-10a-n56
sgp1-10b-n56
**************************************************************************
7th April 2021 starting at 22h00 (Paris time) on Roubaix, FR datacenter:
sw.178.33.236.248-n5
sw.178.33.236.249-n5
sw.178.33.238.248-n5
sw.178.33.238.249-n5
sw.178.33.60.248-n5
sw.178.33.60.249-n5
sw.178.33.61.248-n5
sw.178.33.61.249-n5
******************************************************************************
8th April 2021 starting at 07h00 (Paris time) on Sydney, CA Datacenter:
syd1-10a-n56
syd1-10b-n56
************************************************************************
8th April 2021 starting at 22h00 (Paris time) on Roubaix, FR datacenter:
sw.178.33.62.248-n5
sw.178.33.62.249-n5
sw.178.33.63.248-n5
sw.178.33.63.249-n5
sw.178.165.12.248-n5
sw.178.165.12.249-n5
sw.178.165.13.248-n5
sw.178.165.13.249-n5
Reason for closing: Done
bhs5-16a-n56 == Done
bhs5-16b-n56 == Done
bhs7-10a-n56 == 1step
bhs7-10b-n56 == 1step
I am starting a change on couples: sw.178.33.126.248/249-n5, sw.178.33.228.248/249-n5, sw.178.33.232.248/249-n5, sw.178.33.234.248/249-n5
change was made only on sw.178.33.126.248/249-n5
changes for sw.178.33.228.248/249-n5, sw.178.33.232.248/249-n5, sw.178.33.234.248/249-n5 are postponed
=============================================
I am starting change on switch sw.178.33.236.248/249-n5, sw.178.33.238.248/249-n5, sw.178.33.60.248/249-n5, and sw.178.33.61.248/249-n5.
nous allons redemarrer sw.178.33.236.249-n5 cela va creer de l'impact.
on desisole les fex 100,102,103 sur sw.178.33.236.249-n5
n desisole les fex 104,105,106,107 sur sw.178.33.236.249-n5
Only sw.178.33.236.248/249-n5 are reloaded.
the remaining sw.178.33.238.248/249-n5, sw.178.33.60.248/249-n5, and sw.178.33.61.248/249-n5. are postponed for later.
=============================
I am starting NETCHANGE-1203
reloading couple sw.178.33.62.248/249-n5 first.
we lost some IPs on sw.178.33.62.248/249-n5. We are investigating
All the IPs are recovered.