OVHcloud Network Status

Current status
Legend
  • Operational
  • Degraded performance
  • Partial Outage
  • Major Outage
  • Under maintenance
N5/N56/N6 ISSU campain
Scheduled Maintenance Report for Network & Infrastructure
Completed
Description:
An upgrade campaign is launched on all Nexus 5000/5600/6000 of Baremetal aggregator switches.

Impact:
None, upgrade is done trough ISSU (In Services Software Upgrade)

Duration:
Each couples of Nexus 5000/5600/6000 take 1h30-3h00 to be fully upgraded.

Maintenance date:
Date: 29st March.
Time: 02:00AM - 06:00AM (Montreal time) on Beauharnois on Beauharnois, CA Datacenter
bhs-10a-n5
bhs-10b-n5
bhs1-11a-n5
bhs1-11b-n5
hbs1-12a-n5
hbs1-12b-n5
hbs2-11a-n6
hbs2-11b-n6

Date: 29st March.
Time: 10:00PM - 01:00AM (Paris time) on Graveline , FR datacenter:
gra1-15a-n6
gra1-15b-n6
gra1-16a-n6
gra1-16b-n6
gra1-20a-n6
gra1-20b-n6
gra1-21a-n56
gra1-21b-n56

**************************************************************************
Date: 30st March.
Time: 02:00AM - 06:00AM (Montreal time) on Beauharnois on Beauharnois, CA Datacenter
bhs2-15a-n6
bhs2-15b-n6
bhs2-16a-n56
bhs2-16b-n56
bhs2-17a-n56
bhs2-17b-n56
bhs2-18a-n56
bhs2-18b-n56

Date: 30st March.
Time: 10:00PM - 01:00AM (Paris time) on Graveline , FR datacenter:
gra1-23a-n56
gra1-23b-n56
gra1-24a-n56
gra1-24b-n56
gra1-25a-n56
gra1-25b-n56
gra1-26a-n56
gra1-26b-n56

****************************************************************************
Date: 31st March.
Time: 02:00AM - 06:00AM (Montreal time) on Beauharnois on Beauharnois, CA Datacenter
bhs2-19a-n56
bhs2-19b-n56
bhs2-20a-n56
bhs2-20b-n56
bhs2-21a-n56
bhs2-21b-n56
bhs4-12a-n56
bhs4-12b-n56

Date: 31st March.
Time: 10:00PM - 01:00AM (Paris time) on Graveline , FR datacenter:
gra1-27a-n56
gra1-27b-n56
gra1-30a-n56
gra1-30b-n56
gra2-17a-n56
gra2-17b-n56
gra2-21a-n56
gra2-21b-n56

****************************************************************
Date: 1st April.
Time: 10:00PM - 01:00AM (Montreal time) on Beauharnois on London, CA Datacenter
lon1-eri1-11a/b-n56
lon1-eri1-12a/b-n56
lon1-eri1-13a/b-n56

Update(s):

Date: 2021-03-29 14:43:51 UTC
Attached to https://travaux.ovh.net/?do=details&id=49707

Date: 2021-03-29 14:39:20 UTC
Attached to https://travaux.ovh.net/?do=details&id=49707

Date: 2021-03-29 10:27:13 UTC
Date: 29st March.
Time: 02:00AM - 06:00AM (Montreal time) on Beauharnois on Beauharnois, CA Datacenter

hbs2-11a-n6 == Done
hbs2-11b-n6 == Done
Posted Mar 03, 2021 - 09:00 UTC