Get webhook notifications whenever Network & Infrastructure creates an incident, updates an incident, resolves an incident or changes a component status.
Details
* Description: Maintenance prévu sur le couple de routeurs vss-7a/7b-6k. Ces routeurs assurent la connectivité au réseau publique de serveurs dédiés de RBX3
* Impact: Des perturbations sont à prévoir pendant les bascules de trafic entre les routeurs.
* heure début : 18/Aout/20 10:00 UTC
* heure fin: 19/Aout/20 4:00 UTC
===
* Description: A maintenance is scheduled on the pair of routers vss-7a/7b-6k. These routers manage the connectivity on the public network to dedicated servers in RBX3
* Impact: Perturbations can occur during traffic switchover between routers
* Starting time: 18/Aug/20 10:00 PM UTC
* Ending time: 19/Aug/20 4:00 AM UTC
Update(s):
Date: 2020-08-18 23:26:14 UTC We changed the configuration on both side and everything was smooth. All IP are reacahble
Date: 2020-08-18 23:23:32 UTC We put back the A side in production. Everything is OK. The maintenance is now finished
Date: 2020-08-18 22:57:59 UTC B side is now fully in production, we will now isolate the A side. No impact curretly except expected flap during the swap of the traffic
Date: 2020-08-18 22:26:04 UTC We modified the configuration on B side, we put it back in production
Date: 2020-08-18 22:12:40 UTC We are moving all the traffic to the A side
Date: 2020-08-18 21:46:55 UTC We start the operation
Posted Jul 09, 2020 - 14:12 UTC
This scheduled maintenance affected: Infrastructure || RBX (RBX4).