Get webhook notifications whenever Network & Infrastructure creates an incident, updates an incident, resolves an incident or changes a component status.
We are scheduling a planned work on the optical lines Gravelines <> London and Roubaix <> London lines.
- September 3rd from 22:00 CEST
These operations are intended to change optical parameters on the line in order to make it ready to support up to 80 channels. We are going to change optical parameters and insert new elements in nodes databases.
During the work, no traffic impact is expected as circuits will be switched to protection path.
Update(s):
Date: 2019-09-03 23:31:39 UTC Work is completed on Roubaix <> London line.
Circuits have been switched back to nominal path.
Date: 2019-09-03 22:07:01 UTC Gravelines <> London line changes have been completed. We are switching back circuits on nominal path.
Starting the work on Roubaix <> London line.
Date: 2019-09-03 21:35:54 UTC Optical parameters are being modified on Gravelines <> London line.
Date: 2019-09-03 21:04:34 UTC Work has started on Gravelines <> London line.