FS#38593 — Backbone USA | Los Angeles <> Ashburn

Attached to Project— Reseau Internet et Baies
Incident
Backbone US
CLOSED
100%
Description: Nos liens entre les PoP de Ashburn et Lox Angeles et sont coupés, nous contactons le fournisseur pour une résolution rapide
Impact: Une augmentation de latence est attendu pour les utilisateurs accédant au DC de BHS depuis la cote ouest des USA
ETA: inconnu - mise a jour dans la prochaine heure


Description: A link between Ashburn and Lox Angeles is down, we are checking with provider for a quick resolution
Impact: Latency will increase for clients.
ETA unknown - update coming within the next hour
Date:  Monday, 27 May 2019, 14:05PM
Reason for closing:  Done
Comment by OVH - Friday, 24 May 2019, 01:33AM

Carrier :
"These circuits are involved in major outage event 00983863.
We observe a fiber cut indication between the locations Banning and Indio effecting systems running through Los Angeles and Phoenix."


Comment by OVH - Friday, 24 May 2019, 04:25AM

Carrier :
"The Transport NOC reports that Field Operations are currently at the fault location investigating the possibility of implementing a service migration to expedite restoration. Field Operations are testing the fibers towards Indio, CA in order to isolate any available spare fibers. If no spare fibers are located, then it will be necessary to repair the damage to restore impacted services. The Outside Plant team is currently en-route to the fault location to assist. Restoration crews have also been engaged and dispatched to the failure; however, an ETA is currently unavailable."


Comment by OVH - Friday, 24 May 2019, 05:12AM

Carrier :
"The Outside Plant team reports that the excavation crew along with the replacement cable are expected to be on-site with an ETA of 04:30 GMT. The crews foreman that will assist in providing direction in the repairs is also en-route with an ETA of 03:30 GMT. The ETA for the crew handling the boom truck is still undetermined. The boom truck will be necessary if personnel decide to hang the replacement cable cross utility poles as the temporary fix action. While crews make their way to the fault location, onsite personnel are assessing the damage further to formulate a proactive repair plan. "